451 E Malaga Demolition
Morrison Excavation completed the 451 E Malaga Demolition project, expertly handling the demolition of the existing slab-on-grade house, comprehensive tree clearing, and safe disconnect of utilities. This project highlights our commitment to quality excavation and trusted relationships, ensuring efficient site preparation tailored to our clients' needs.

Limerick Hopper Pad
At Morrison Excavation, we recently completed the Limerick Hopper Pad project, expertly building a retaining wall into the existing hill to create a stable, level pad for the proposed hopper. This work exemplifies our commitment to quality excavation and trusted relationships by delivering precise site preparation tailored to client needs.

Windy Hill Tot Lot/ Dog Park
Morrison Excavation recently completed the Windy Hill Tot Lot and Dog Park project, expertly preparing the subgrade, exporting excess fill to an onsite stockpile, and precisely grading and compacting the site. Utilizing the proposed grading plan and existing stakeout, the team laid out the site to ensure seamless preparation for the concrete contractor, exemplifying our commitment to quality excavation and trusted community partnerships.

NJ Urology Addition
Morrison Excavation completed the NJ Urology Addition project, expertly managing the removal of brush, concrete curb, sidewalk, and asphalt parking lot, followed by foundation excavation and over-excavation to install engineered fill. The project also involved rerouting a 6" water main and roof drains to accommodate the proposed building addition, demonstrating our commitment to quality excavation and trusted client relationships.

Newark Utility Service
Morrison Excavation completed a Utility Service installation, expertly setting up traffic control, saw cutting the roadway and excavating a trench for a customer’s gas service while carefully overcoming numerous buried obstacles. Our team ensured precise backfilling, compaction, roadway restoration, exemplifying our commitment to quality excavation and trusted relationships!

Cobblestone Creek Basin Reconfiguration
Morrison Excavation recently completed the Cobblestone Creek Basin Reconfiguration, expertly raising the basin top by 9 inches to enhance capacity by reshaping the basin bottom contours to increase slope toward the concrete channel, generating material for the berm raising. Additionally, we restored the cart path along the basin’s to

Eagleswood Pole Barn Pad
Morrison Excavation recently completed the Eagleswood Pole Barn Pad project, expertly clearing trees, importing fill dirt, grading and compacting the building pad to meet precise construction standards. The scope also included the installation of durable 6" concrete-filled bollards, demonstrating our commitment to quality excavation and trusted client relationships.

Morrisville Drainage Swale & Water Break
Morrison Excavation recently completed the Morrisville Drainage Swale & Water Break project, expertly demolishing existing site improvements to reshape the drainage swale and install a water break that slows uphill runoff. This precise grading enhancement improves slope and increases water runoff efficiency from existing structures, exemplifying our commitment to quality excavation and trusted relationships.